Office Relocation Checklist: Everything to Sort Before You Move Premises
Moving office is one of the biggest operational projects most businesses ever undertake outside their day-to-day work. It affects every department, every supplier, and every member of staff.
As such, nailing it is of course of the utmost importance.
We’ve put together the office relocation checklist below to help clients smooth out the entire process.
It’s not exhaustive, but it covers the elements almost every business needs to think about in advance so they’re ready to execute when the time comes.
Start Planning Twelve Months Out
The bigger the business, the earlier you need to start. For a company of 20 to 100 people, twelve months is realistic. Legal negotiations on a new lease alone can take six months, often more. For anything larger, start earlier still.
Early planning gives you time to negotiate on the new space, run a proper fit-out design process, book installations with enough buffer for delays and communicate the move to your team without rushing them.
Your Current Lease and Exit Obligations
Review your lease and obligations well in advance. The main items to review are:
- Notice period and formal notification to the landlord
- Dilapidations obligations (reinstatement of alterations, redecoration and floor coverings)
- Overlap between old and new lease dates to allow a phased move
- Deposit return conditions and timelines
- Any break clauses or early exit penalties
Most dilapidations schedules are open to negotiation, but only if you engage with them before the last minute. A schedule of condition or a specialist dilapidations surveyor is money well spent.
A Checklist for Office Relocation Fit-Out
The new premises rarely arrive fit for purpose. Category A shells need Category B fit-out work, and even a plug-and-play office usually needs adjustments to match how your business operates.
The main areas to plan cover:
- Design: layout, breakout areas, meeting rooms, private offices and storage
- Building regulations approval and dutyholder appointments under the Building Safety Act
- Any necessary planning applications, and listed building consent where it applies
- Asbestos surveys before any works begin
- Contractor lead-in period (usually four weeks from instruction to proceed)
- Furniture procurement or reuse of existing pieces
- Data and power cabling routed to match the layout
- Kitchen, welfare and washroom facilities
- Wayfinding, signage and any branded elements
Fit-out lead times run from four weeks for a simple refresh to three months or more for a full rebuild. Working these back from your move in date is essential.
IT, Telecoms, and the Delays That Catch Everyone Out
Broadband and leased line installation is one of the most consistently underestimated elements of an office move. Lead times of eight to twelve weeks for a business leased line are common and quite a bit longer if any civil works are involved.
The essentials to lock in early:
- Business broadband or leased line order placed as soon as the new address is confirmed
- Phone system migration (VoIP is generally portable, physical lines less so)
- Server, network and cloud infrastructure planning
- Cabling and comms room specification aligned to the fit-out
- IT support cover across the transition period
Once the new address is confirmed and access is available, book everything you can immediately. The last thing you want is moving into an offline office with no internet!
A Moving Business Premises Checklist for Your Team
Office moves create plenty of questions, so clear communication matters from the start.
Keep your team updated on:
- Key dates: When the move is happening and any important milestones before then.
- Travel and commuting: Changes to journey times, parking, public transport or site access.
- Working arrangements: Any temporary changes to hours, remote working or where teams will be based.
- The new workplace: Access details, facilities and anything employees need to know before they turn up.
- What happens next: Who to contact with questions and when further updates will be shared.
You’ll also need to update external contacts, including suppliers, clients and any official records that use your business address (including at Companies House).
How Environments for Business Supports Your Move
We deliver first-class commercial fit-outs and office relocations. Every move has its own challenges, but we’ve refined our process across numerous projects. Above all else, we’ll be a friendly and experienced face for the whole journey.
For clients moving premises, we can take on as much or as little of the coordination as you want us to. That includes:
- Fit-out design and delivery in the new space
- Building control notification and dutyholder appointments under the Building Safety Act
- Project management and coordination with telecoms, IT, and furniture suppliers
- Dilapidations advice for the space you’re leaving
- Aftercare and follow-on works once you’re settled in
Our small works team is backed by our ISO processes and insurances. A small general builder or handyman may not have these in place, so working with us means our high safety and quality standards are met even on the smallest of works.
If you’re planning a move and want an experienced partner to run the fit-out and hold the timeline, get in touch and we’ll take it from there.